Posted on March 10, 2015

The Public Works Authority ‘Ashghal’ has announced a road closure to be implemented on Othman Bin Affan Street located between the Al Waab Street junction and Saeed Bin Al Aas Street. The closure aims at initiating phase one of the Roads and Infrastructure Development project in East Al Aziziya area. The closure is scheduled to be implemented as of Thursday 12 March 2015 and will continue for a period of 8 months.

As part of the closure, a temporary road is constructed for use during the closure period and the circulation will be diverted in both directions for the motorists using this carriageway, while residents and business owners in the area can reach their residents and shops through Al Aziziya Street (as shown in the map) Ashghal urges all commuters to abide by the speed limits to help ensure their safety and to follow the new instructions displayed in the area to guide them.

Ashghal to implement a road [qatarisbooming.com].jpg

Categories: